
Upgrades & Installation
Panel Upgrades
100–200 amp panel replacements for aging homes and added electrical load.
Panel Upgrades in Washington, D.C. / Maryland
Many homes across Bowie, College Park, and Wheaton were built with electrical panels never designed for today's appliance and EV load, and an undersized or outdated panel is one of the most common findings during our assessments. Beacon Electric Co. handles permitting, county inspection coordination, and a full panel replacement with minimal downtime — most upgrades are completed and re-energized within a single working day. Every upgrade includes a labeled circuit directory and a final walkthrough before we close out the permit.
Most 200-amp panel upgrades range $1,800–$3,800 depending on permit and utility coordination. — get your exact number, free and in writing.
“We'd been putting off our panel upgrade for years because every quote felt vague. Beacon walked us through permit costs, timeline, and exactly what a 200-amp panel would support before we signed anything. Power was back on the same day, and the inspector had no issues.”
How it works
From service call to sign-off, in three steps
Free Assessment & Written Quote
A licensed technician evaluates the issue or project on-site and provides a written estimate before any work begins — no verbal-only pricing.
Scheduled Service & Documentation
Work is performed on the scheduled date, with photos and notes captured at each stage for your records and, where applicable, county permitting.
Final Walkthrough & Sign-Off
Every project concludes with a walkthrough alongside the homeowner confirming the work matches the quote before final payment is collected.
No pressure. No hidden fees. Written quotes valid 30 days.
Questions
Panel Upgrades questions, answered
Ready for panel upgrades?
We reply in under 5 minutes, 7 days a week. Tell us about your home and we'll get you a written quote.
We reply in under 5 minutes, 7 days a week
Get my free quote
30 seconds. No pressure. We reply in under 5 minutes, 7 days a week.
Step 2 of 3
